注册 登录  
 加关注
   显示下一条  |  关闭
温馨提示!由于新浪微博认证机制调整,您的新浪微博帐号绑定已过期,请重新绑定!立即重新绑定新浪微博》  |  关闭

锦瑟空城

我不知道最后的我们会走到哪里,也许在时光里彼此错失,抑或,再次相遇。

 
 
 

日志

 
 

【转载】半月段染披肩  

2013-09-26 20:14:31|  分类: 披肩 织 |  标签: |举报 |字号 订阅

  下载LOFTER 我的照片书  |
本文转载自编织幸福《半月段染披肩》
半月段染披肩 - 编织幸福 - 编织幸福的博客
 
半月段染披肩 - 编织幸福 - 编织幸福的博客
 
半月段染披肩 - 编织幸福 - 编织幸福的博客
 
半月段染披肩 - 编织幸福 - 编织幸福的博客
 

PATTERN NOTES
[Knitty's list of standard abbreviations and techniques can be found here.]

The short rows are worked simply, without wrapped stitches; the short row gaps are closed using ssk and p2tog decreases instead of the usual wraps.

The 2 st I-cord BO is used to create a firm edge to support the crescent shape during blocking to allow the lace points to stretch fully.

sl2, k1, p2sso: Slip 2 sts knitwise; k1; pass slipped sts together over the knit st.

C3/3F: Slip 3 sts to cable needle and hold to front of work; k3 from left needle; k3 from cable needle.

DIRECTIONS

Shawl
With US #10.5 needle CO 343 sts.

Do not join; shawl is worked back and forth in rows.

Switch to US #8 needle and work Rows 1-22 of the Beithe chart. 271 sts remain on needles.

Shape shawl body using short rows as follows: 
Row 1 [RS]: K140, turn work.

Row 2 [WS]: P9, turn work.

Row 3 [RS]: K8, ssk, k3, turn work.

Row 4 [WS]: P11, p2tog, p3, turn work.

Row 5 [RS]: K14, ssk, k3, turn work.

Row 6 [WS]: P17, p2tog, p3, turn work.

Row 7 [RS]: K20, ssk, k3, turn work.

Row 8 [WS]: P23, p2tog, p3, turn work.

Row 9 [RS]: K to 1 st before gap created by turn, ssk, k3, turn.

Row 10 [WS]: P to 1 st before gap created by turn, p2tog, p3, turn.

Repeat the last 2 rows until all sts are worked, ending with a WS row.

Next row [RS]: K1, *p1, k1, rep from * to end.

Next row [WS]: K1, *p1, k1, rep from * to end.

Work 2 st I-cord BO [RS]: With completed knit on left needle, CO 2 sts. 

*K1, ssk; sl sts back to left needle; pull yarn tightly across back of work; rep from * to end.

FINISHING
Weave in all loose ends. Block piece to measurements: start with the two short sides (6") followed by the lace center point, then pin out the rest of the points along the edge. When completely dry, remove pins and trim all yarn tails.

  评论这张
 
阅读(50)| 评论(0)
推荐 转载

历史上的今天

评论

<#--最新日志,群博日志--> <#--推荐日志--> <#--引用记录--> <#--博主推荐--> <#--随机阅读--> <#--首页推荐--> <#--历史上的今天--> <#--被推荐日志--> <#--上一篇,下一篇--> <#-- 热度 --> <#-- 网易新闻广告 --> <#--右边模块结构--> <#--评论模块结构--> <#--引用模块结构--> <#--博主发起的投票-->
 
 
 
 
 
 
 
 
 
 
 
 
 
 

页脚

网易公司版权所有 ©1997-2017